top of page

Arts
Trades
Culinary

Framing a Door's Rough Opening
Framing a rough opening means adding about 1/2 inch clearance between the top and both sides of the door jams and the framed rough opening. This clearance provides you with a little room to fine tune the door position before securing it in place.
​
To determine the size of the rough opening, measure the height and width of the pre-hung door, add the clearances mentioned above, and you've got the size of the rough opening.
​
During the actual door installation, you will use shims to adjust the door jams and 16d casing nails to hold the pre-hung door in place.
​
bottom of page